Case Study: Moore’s Tyres Moore’s Tyres at Wulkaraka is a tyre supplier and fitter specialising in tyre solutions for the transport industry. Moore’s engaged e4b just […]

Case Study: Moore’s Tyres

Moore’s Tyres at Wulkaraka is a tyre supplier and fitter specialising in tyre solutions for the transport industry. Moore’s engaged e4b just prior to expiry of their existing retail supply contract in early 2015.

Based on an analysis of the site’s historical meter data, e4b determined that one of the business’s connection points was incorrectly assigned to a large customer demand-based network tariff. e4b subsequently managed a network tariff change request, ran a competitive tender, and negotiated a new retail energy supply agreement on behalf of the owners that resulted in savings of more than 44%.

e4b also successfully negotiated a refund from the distribution network owner of more than $11,000 due to the incorrect tariff assignment.

Customer Profile:
Electrical Load: 123 MWh p.a.
Maximum demand: 138 kilowatts
Load factor: ~10%
Network Tariffs: Ex8500
Connections/meters: 2 / 2

Results:
Net savings: $20K per year
Net savings (%): 44.2%


Case Study: Lamington Hotel Motel

The “Lammy” is located a stone’s throw away from the Mary River on the southern side of Maryborough.

The business was being supplied by Ergon Energy under a regulated demand tariff. Based on an analysis of historical meter data, e4b determined that the business would benefit significantly by moving to a market-based supply contract.

e4b subsequently managed a competitive tender on behalf of the owners and negotiated a new energy supply agreement that resulted in savings of more than 25%.

Customer Profile:
Customer Profile:
Electrical Load: 223 MWh p.a.
Maximum demand: 62 kilowatts
Load factor: 41%
Network Tariff: EDSTT1
Connections/meters: 1 / 1

Results:
Net savings: $17K per year
Net savings (%): 25.2%


Case Study: Royal Pines Resort Body Corporate

Royal Pines Resort is an exclusive gated community located on the Gold Coast.

The principal body corporate engaged e4b to assist with optimising its energy costs for common areas and facilities. e4b subsequently managed a competitive multi-site tender on behalf of the body corporate and negotiated a new energy supply agreement that resulted in savings of more than 23%.

Customer Profile:
Customer Profile:
Electrical Load: 175 MWh p.a.
Network Tariff: Ex8500
Connections/meters: 6 / 6

Results:
Net savings: $11K per year